PrimeSun 233K | Industrial-grade Energy Hub,Mining Micro-grid Energy Solution
PrimeSun 233K | Industrial-grade Energy Hub,Mining Micro-grid Energy Solution
PrimeSun 233K | Industrial-grade Energy Hub,Mining Micro-grid Energy Solution
PrimeSun 233K | Industrial-grade Energy Hub,Mining Micro-grid Energy Solution
PrimeSun 233K | Industrial-grade Energy Hub,Mining Micro-grid Energy Solution

PrimeSun 233K | Industrial-grade Energy Hub,Mining Micro-grid Energy Solution

Sale price$7,999.00 Regular price$9,980.00
Save $1,981.00

Quantity:

Overview

The PrimeSun 233K is a cutting-edge off-grid microgrid system specifically developed for mines, remote construction sites, and rural areas. As an industrial-grade energy hub, it integrates photovoltaic, energy storage, and diesel generator technologies to provide efficient, green, and reliable power for production, daily life, and temporary auxiliary needs. Whether for a 100-person camp, 173-household village, or remote construction operations, this system delivers stable energy solutions where traditional power supply is scarce or unreliable.

Key Specifications

Parameter Detail
PV Installed Power 100kWp
Max Output Power 100kWp
Energy Storage Capacity 233kWh
Inverter Output Voltage AC380/220V
Unfolded Dimensions 120x9m
Folded Dimensions 6.05x2.43x2.89m
Daily Electricity Cost 16.5 dollars per day


Product Highlights

1. Modular Design for Flexible Scaling

  • Customizable Capacity: Expandable according to diverse electricity demands. With 5 units in parallel, the maximum photovoltaic/storage capacity can reach 1MW/1165kWh, adapting to growing power needs of large-scale projects.
  • Plug-and-Play Integration: Simplified connection between modules ensures easy capacity upgrades without disrupting existing operations.


2. High Mobility for Rapid Deployment


  • Containerized Structure: Built into a standard shipping container, enabling convenient transportation via trucks, trains, or ships.
  • Quick Assembly: Connected to the ground via screw piles on tracks, allowing rapid disassembly and relocation between sites.
  • Minimal Site Requirements: No complex foundation construction needed, reducing pre-installation preparation time.

3. Ultra-Fast Commissioning for Immediate Power Supply

  • Rapid Deployment: Starts supplying electricity within 2 days after arriving at the site, drastically shortening the construction and commissioning cycle (conventional micro-grids take over 15 days).
  • Plug-and-Play Operation: Pre-integrated systems and pre-tested components minimize on-site setup work, ensuring quick access to power.

4. PV-Storage-Diesel Hybrid Network for Stability

![Hybrid system image: It is recommended to show the integrated control logic of photovoltaic, storage, and diesel systems](Suggested image: Hybrid system control diagram)


  • Low-Voltage Grid-Forming Scheme: Achieves seamless integrated control of photovoltaic, energy storage, and diesel generator systems.
  • Intelligent Energy Management: Optimizes energy distribution between clean photovoltaic power, stored energy, and backup diesel generation, balancing efficiency and reliability.
  • Stable Power Output: Maintains consistent voltage and frequency even in fluctuating load conditions, protecting sensitive equipment.

Application Scenarios

The PrimeSun 233K is designed to meet power demands across multiple scenarios:


  • Mining Camps: Powers production equipment, lighting, air conditioners, water heaters, and daily appliances for at least 100 people.
  • Remote Construction Sites: Supports temporary auxiliary equipment such as small concrete mixers and steel bar benders.
  • Rural Areas: Fulfills the daily electricity needs of villages with up to 173 households, including refrigerators, electric kettles, and basic lighting.

Global Green Mining Cases

Zambia Copper Mine Microgrid Project(13MW/39MWh solar-storage-diesel)

Indonesia Mine Microgrid Project (3MW/5MWh solar-storage-diesel)

DRC Mine Microgrid Project (8MW/27MWh solar-storage)

Vietnam Mine Microgrid Project (2.7MW/2.13MWh solar-storage)

Guinea Mine Microgrid Project (7MW/21MWh solar-storage)

Zambia Mine Microgrid Project (10MW/16.8MWh solar-storage)

Why Choose PrimeSun 233K?

  • Green Energy Priority: Maximizes the use of photovoltaic power to reduce carbon emissions and reliance on fossil fuels.
  • Cost-Effective: Low daily electricity cost (16.5 dollars/day) and reduced transportation/installation expenses compared to traditional power solutions.
  • Reliable Off-Grid Operation: Ensures uninterrupted power supply in areas without grid coverage or with unstable grid access.

About Us

SANY Silicon Energy specializes in the full-process independent R&D and production of ingots, wafers, cells, modules, and PV power stations. SANY Silicon Energy has successfully developed and implemented GW-scale PV power station projects, demonstrating remarkable strength in the fields of Green Mining, Green Transportation, Green Manufacturing, and Eco-industrial Parks. It achieves intelligent and refined management throughout the entire value chain, from design and construction to operation and maintenance.

For more details or customization inquiries, please contact our sales team.
SANY Silicon Energy : siliconenergy.sany.com.cn 

Contact Us:

All shipping lines

Sea/Air/Train